Council Member· January 2026 - December 2029 (month-level start: January 2026 per Nov 4, 2025 election win (The Citizen) and Jan 2026 State of the City coverage naming him seated; month-level end: December 2029 per 4-year term stated on the city Mayor and Council page)
Michael Polacek
Peachtree City
No biography on file yet.
Voice
- Meetings spoken in
- 18
- Total speaking time
- 1:36:42
- Avg per meeting
- 5:22
- Segments
- 1173
Want every word Polacek has said?
The OpenCity MCP for Claude.ai answers questions like “what has Polacek said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (13)(Roads)
Golf cart connectivity on the Highway 74/Widget Drive corridor
Expanded paths would add maintenance costs and policing demands borne by Peachtree City taxpayers.
Highway 54 East pedestrian bridge
$234,500 for 30% design now; the full bridge has $4 million in 2023 SPLOST plus a $7 million grant.
Golf cart bridge over Highway 54
Funded by 2023 SPLOST and federal ARC grant money — no property tax dollars.
Heavy truck ban extended to Rockaway Road
North Hill/North Cove multi-use path tree removal and safety
$943,416 contract for the path construction.
Meade Recreation Complex Road Cost-Share
$400,000 change order, backed by $595,000 in additional state LAMIG grant money.
Peachtree Parkway at Robinson Road intersection improvements
Design consultant cost under $150,000; full construction cost to follow the study.
SR 54 corridor study
The city's share of the roughly $500,000 study is expected to be small.
Crosstown tunnel replacements
$300,000 for design now; roughly $2.8 million for construction later, all SPLOST-funded.
Booth/McIntosh grade-separated crossing grant
About $2 million of the roughly $10 million cost would come from SPLOST if the grant is awarded.
Shared-use path system planning
A HAWK signal isn't funded by impact fees or SPLOST and may appear as a general fund budget request.
Abandoned Path and SR 54/74 Pedestrian Crossings
2026 street paving and stormwater pipes
About $7 million combined between paving and stormwater piping.
Decisions during term (0)
Recorded while Polacek was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.
Voting record (0)(Roads)
No votes found matching Roads.